MIG/DeWane Landfill
Between 1969 and 1988, the 47-acre landfill received general refuse and industrial wastes including paint sludge, volatile organic chemicals, asbestos and liquids containing heavy metals. The site was not properly closed and capped, resulting in a 5 to 10-acre depression in the middle of the landfill. This depression collected water, which drained into the landfill, resulting in over one hundred leachate seeps.