Final Structural Beam Placed at University of Illinois Chicagos New Engineering Building

Press release: The final piece of structural steel beam will be placed on the Computer, Design, Research, and Learning Center (CDRLC) at the University of Illinois Chicago (UIC) on March 29 at 2:00 p.m.

Information

Attachments

Loading...
Current image, full-size
Current image, reduced-size
Other download options: