Application for Certification to Install, Maintain or Repair Electric Vehicle Charging Station Facilities under Section 16-128A of the Public Utilities Act.
Press release: The Illinois Commerce Commission (ICC) opened a notice of inquiry (NOI) into a recent Ameren Illinois study examining the costs and benefits of remaining a Midcontinent Independent System Operator (MISO) member compared to joining PJM Interconnection (PJM), the grid operator that serves the northern part of the state.
Press release: The property assessment equalization factor (the multiplier) is the method used to achieve uniform property assessments among counties, as required by law.